Expand Map | Collapse Map

Interstate 10 from U.S. 90 to U.S. 129

Project Description

Approximately nine miles of Interstate 10 from U.S. 90 to U.S. 129 in Suwannee County is scheduled to be resurfaced in 2011 at an estimated cost of $16 million. The travel lanes from U.S. 90 to U.S. 129 along with the ramps at each interchange will be resurfaced. This project also includes resurfacing U.S. 90 beneath the interchange.

In addition to resurfacing, one half mile of guardrail will be added on each side of both interchanges for safety.

Overview

Project Begins: Spring 2011
Expected Completion Late 2011

Affected Areas

Roads: Interstate 10, U.S. 90
Counties: Suwannee

For More Information Contact:

Jamie Driggers
800-749-2967
james.driggersjr@dot.state.fl.us